Friday, September 21, 2007

Kitchen Remodel: The Tileman Cometh

The the drywall guy finished two days ago (Paul still needs to prime and paint the walls). Yesterday the tileman came, put in screws to remove floorboard squeaks, laid a steel mesh, and today started leveling the floor. If you look at the picture below, he's putting on a about 1/2 inch to level off all irregularities in our floor (he's almost finished). After the tileman is finished the cabinets get installed. Woo-hoo!

Imagine tile, cabinets, countertops, etc here...